Mold RemovalCambridge(315) 640-3590Tap to call

Watertown, MA

Watertown Mold Removal When the Cellar Is Shared

One scope, two signatures: the clean way through a shared cellar is a written list of what comes out and which household it belongs to.

Plastic containment barrier taped across a doorway, with a gray air scrubber, a shop vacuum and sealed waste bags in front

Mold Removal quote in Watertown

Tell us which room it is, what the surface is made of and whether the leak has been repaired. If the building predates 1978, say so, because that changes the order the work has to run in.

By submitting this form you agree to be contacted by us and by one or more independent contractors we introduce for this request. See our Privacy Policy. Your details are used only to respond to this request and arrange the service.

Would you rather talk it through? (315) 640-3590Tap to call

What Watertown two-family owners ask about splitting the work

The other owner will not pay. Can we just do our half?

Sometimes, for material that sits inside your own space. The problem is that the water source is usually in the shared part, so a half job gets re-wetted. Have the scope written for the whole cellar even if only part of it is authorized, so the record shows what was left undone.

Is the ten square feet per patch or in total?

The EPA's guidance is about the moldy area, roughly a three foot by three foot patch, so several small patches with one shared cause are better judged together rather than counted separately. If it is borderline we will say it is borderline rather than rounding it up.

What comes out of a shared Watertown cellar

In a Watertown two-family the physical work is usually straightforward and the agreement is not. What comes out of a shared cellar is the absorbent material the water actually reached: the bottom band of drywall, pad and carpet, batt in the joist bays, sometimes a section of subfloor.

What has to be settled before the containment goes up is which of those items belongs to one household and which belongs to the shared part, because 77.7 percent of this town's housing predates 1980 and in a house of that age nobody ever drew that boundary on anything.

The contractor writes the scope by location as well as by material so the split is on paper first.

Two gates before a Watertown start date

  1. Whose part of the cellar it sits in

    Storage bay, shared utility area or a unit's own space. Writing the scope by location is what stops the bill becoming a negotiation.

  2. The survey before the saw

    Pre-1980 stock and a written asbestos survey covering cavities, above ceilings and between floor layers. That is two calendar weeks if abatement follows.

  3. Under about ten square feet

    Roughly a three foot square on a hard surface is a homeowner job by the EPA's own guidance, and we will tell you when yours is one.

Two gates sit in front of any start date here, and it is better to hear about them now.

The first is age: in a pre-1980 house, cutting plaster, layered flooring or pipe insulation means a written asbestos survey has to come first, and where abatement follows, MassDEP must have received the notification at least ten working days beforehand, so no honest schedule begins next Tuesday.

The second is size: the EPA puts the do-it-yourself line at about ten square feet, roughly a three foot by three foot patch, and under that on a hard surface this is genuinely something an owner can handle. We would rather say that on the phone than after.

Watertown's build years and the notice period

Watertown has 44.4 percent of its housing units built in 1939 or earlier and a median year of construction of 1947, with 77.7 percent built before 1980. 34.7 percent of its units sit in two-unit structures, the highest two-family share in this coverage area. (U.S. Census ACS 2020-2024)

310 CMR 7.15(4) requires the owner or operator of a facility containing suspect asbestos-containing material to engage an asbestos inspector before any demolition or renovation and to obtain a written asbestos survey report covering everywhere the work will breach, including wall cavities, areas above ceilings and spaces under and between multiple layers of flooring. The only exception is the owner of an owner-occupied single-family residence doing the work themselves on non-friable material alone. (310 CMR 7.15(4))

A gray clapboard porch with a black front door, iron stair railing, a brick chimney, a downspout and a barred basement window
Check downspouts and basement windows first.

On the record: what the code says

310 CMR 7.15(6)(a) requires a completed asbestos notification form and any applicable fee to be received by the Massachusetts Department of Environmental Protection at least ten working days before asbestos abatement begins, and a working day is any day the Department is open for business. (310 CMR 7.15(6)(a))

The EPA advises that if the moldy area is less than about ten square feet, roughly a three foot by three foot patch, in most cases a homeowner can handle the cleanup themselves. (U.S. EPA)

Two owners, one cellar?

Send the layout and the contractor we introduce will write the scope so the split is obvious.

Tell us what the water reached

The contractor we introduce lists what has to come out and where the line sits.

Your request is free and creates no obligation.