The short answer
Six things decide it, and none can be seen from a description: the area involved, whether the water source has been found and stopped, whether the wet material is porous, whether an asbestos survey is in play, whether the building is rented, and whether ventilation work is needed. Anyone quoting a figure before knowing those six is quoting a different building.
What does mold removal cost, and why does nobody give me a number over the phone?

Why this page has no range on it
Price bands for mold work are statements about buildings the author never entered, so this page has no range. There are two reasons. This operation does not set the contractor's price, so a number here would be a guess dressed as a quote.
And the scope is defined by more than the wall.
105 CMR 410.020 defines Compliance as correcting the violation in a workmanlike fashion and restoring all parts of the dwelling to their earlier condition, with an official signing off where a building, plumbing or wiring permit was needed.
Two jobs with the same square footage and different finishes and permits are not the same job. (105 CMR 410.020)
Your next step: read the six variables below and place your own building against them before anyone visits.
One: the area, measured against ten square feet
This is the biggest lever and the cheapest to settle yourself. The EPA advises that a moldy area under about ten square feet, roughly three feet by three feet, can in most cases be cleaned by the homeowner.
Under that line, the realistic cost is a cleaning product, an afternoon and maybe a replacement ceiling tile. Over it, you move into containment, protective equipment, controlled demolition and disposal.
The step between those two worlds is far larger than the step between twelve and twenty square feet. Measure generously. Soft plaster, hollow sounding drywall or a stain running away from the patch all mean the affected area is bigger than the visible one.
Your next step: measure it and write the figure down.
Two: whether the water has been found and stopped
A job with a known, stopped source is bounded. A job with an unexplained source is an investigation attached to a job, and the same wall may be opened twice.
The EPA's advice to households is mostly about moisture, not mold: hold indoor relative humidity between 30 and 60 percent, vent bathrooms and dryers outside, use air conditioners and dehumidifiers, increase ventilation.
A removal done while the source still runs is money spent on a symptom. Timing matters too. 105 CMR 410.500(B) requires all surfaces to be dried within 48 hours of notification or the end of the event.
Material dried inside that window frequently never becomes a removal job. The cheapest mold job in this city is the water damage job that happened fast enough. (U.S. EPA; 105 CMR 410.500(B))
Your next step: find the source and stop it before you ask for any removal quote.

Three: what the wet material actually is
Hard, non porous surfaces clean. Absorbent ones leave. The EPA notes that absorbent or porous materials such as ceiling tiles and carpet may have to be thrown away because mold can grow into them. That one distinction reorganizes a quote. Tile and concrete are labor.
Carpet, pad, insulation, ceiling tiles and wet plaster are demolition, disposal and replacement. The housing here leans toward the expensive side. Cambridge has 47.0 percent of its units built in 1939 or earlier and a median construction year of 1950.
That means plaster on wood lath rather than screwed drywall, layered flooring, and cavities that hold water quietly. Rebuilding lath and plaster is a different trade from cutting out a drywall panel. (U.S. Census ACS 2020-2024; U.S. EPA)
Your next step: list what is wet and what it is made of.
Want this checked on your property?
Send the street and what you can see. We will tell you which job it is.
Four: whether the asbestos survey and its ten working days are in play
This factor moves the schedule more than the invoice, and schedule is cost when a room is out of use.
310 CMR 7.15(4) requires a written asbestos survey by an inspector before any renovation that will breach suspect material, including wall cavities, above ceilings and between layers of flooring.
If the result is at or above the regulation's threshold, 310 CMR 7.15(6)(a) requires MassDEP to receive the notification at least ten working days before abatement begins. The do it yourself exemption will not help.
310 CMR 7.15(1) excludes rental property, multiple-family buildings and mixed use buildings from the definition of an owner occupied single family residence. (310 CMR 7.15(4); 310 CMR 7.15(1))
Your next step: on a triple decker or rented two family, plan for the survey, the wait and a separate licensed trade before mold demolition starts.
Five: whether the building is rented, which changes your protections
The same work on the same wall has different legal backing depending on who lives there. MGL c.142A s.2 requires any residential contracting agreement above the chapter's one thousand dollar threshold to be in writing with ten specified items.
It caps any advance deposit at the greater of one third of the contract price or the actual cost of special order materials, and allows no final payment demand until the work is complete to the satisfaction of the parties.
But s.1 limits all of that to a pre-existing owner occupied building of one to four dwelling units. A building the owner does not occupy falls outside the chapter, so neither the registration duty nor the Residential Contractor's Guaranty Fund reaches it.
With 66.5 percent of Cambridge households renting, that is the majority case here. (MGL c.142A s.2; MGL c.142A s.1)
Your next step: if you are a landlord, tighten the written contract, because no Fund stands behind it.

Six: whether ventilation work is needed to stop it coming back
A removal that leaves conditions unchanged buys a repeat, so an honest scope sometimes includes work that is not mold work. 105 CMR 410.280 requires ventilation to the outdoors for every habitable room and every room with a toilet, bathtub or shower.
That means openable area of at least 4 percent of the floor area, or mechanical ventilation at 2 air changes per hour for a habitable room and 5 for a bath, toilet or shower room.
Interior bathrooms in older housing here rarely reach 4 percent, so the answer is a fan ducted outdoors, not a window. And opening a window is no answer much of the year.
The average daily dew point at Logan is 60F or higher every day from July 7 through August 23, so summer air brings moisture into a cool room. A dehumidifier and a duct are cheap against doing the demolition twice. (105 CMR 410.280)
Your next step: check how your bathroom or cellar is ventilated now.
What a written price has to contain, and what it protects
Whatever the number is, the document around it is what you can check. On an owner occupied one to four unit building, MGL c.142A s.2 lists the ten items a contract above its threshold must carry.
They include a detailed description of the work and materials, start and substantial completion dates, the total price and a payment schedule, plus the deposit cap above.
If the work is then done badly, MGL c.93A s.9 requires a written demand for relief mailed or delivered at least 30 days before filing suit.
A court may award two to three times actual damages plus fees for a willful violation or a bad faith refusal to settle. Use those as a specification for the paperwork you ask for on any building, including one the statute does not reach. (MGL c.142A s.2; MGL c.93A s.9)
Your next step: do not sign anything that lacks scope, dates, price and payment schedule in writing.
The cheapest outcome, which is sometimes no job at all
Work through the six. Many situations resolve downward: a small measured patch, an obvious stopped source, a hard surface, a post 1980 building, an owner occupier, and a bathroom fan that already vents outdoors is an afternoon, not a project.
We would rather tell you that than sell you the alternative. Send the measurement, the photographs, the age of the building and what you know about the water, and you will get an answer about which of the six apply to you.
Where the work is real, we arrange it with local contractors licensed and insured for the trades involved and priced against a written scope you can hold them to.